Network / current status

A roadmap with gates.

The project website is online. TFA’s observer and evidence network advance only as their acceptance checks pass.

Checking live collection…Public findings: not releasedDemo data: fictionalSee live collection →

What is running today?

A static information site and fictional demonstration are public. The offline prototype supports selected stored transfer records, bounded forward paths and synthetic launch relationships. The continuous observer receives real Pump-program logs. Explore shows decoded launches, retained transfers, conservative traces and evidence-processing status.

CapabilityCurrent state
Offline forward tracingImplemented with bounded fixtures and explicit assumptions.
Backward tracingImplemented for supported retained transfers; complete historical evaluation remains unfinished.
Historical studySources cataloged. Historical detector evaluations remain unassessable until required histories and decoders exist.
Live observationContinuous Pump log monitoring, launch decoding, queued transaction retrieval and recovery are active under Explore.
TFA GlobeDesign prepared. Private build at Stage 3.
Independent network / coinResearch stages ahead. No coin has launched.

One stage at a time.

StageWhat it deliversEvidence needed to advance
0 · reviewedArchitecture and threat model.Documented design and owner decisions.
1 · currentOffline prototype and stored fixtures.Reproducible checks, corrections, gaps, legitimate controls and historical-case limitations. Work remains before full acceptance.
2 · bounded pilotPrivate Solana observer with public aggregate status.Approved provider budgets and watchlist; tested isolation, checkpoints, backfill, source disagreement and off-host restore.
3 · plannedPrivate evaluation and TFA Globe.Held-out accuracy, delay and cost results; correction, usability and restore tests.
4 · plannedPublic findings, search and globe.Legal review, publication policy, working free disputes and appeals, security review and release approval.
5 · plannedIndependent operators.Measured source/operator independence and resilient handling of conflicting or unavailable observers.
6 · researchSeparate network and possible native coin.Adversarial testnet, reviewed consensus and rewards, genesis/supply decisions, audits and a separate coin launch decision.

Rough estimates, not launch dates

The September 2026 draft white paper estimates private monitoring in about 1–2 months, public findings in about 4–8 months, and a possible coin decision in about 18–24 months, if the required stages succeed. Those are unvalidated planning ranges. Completion checks, not the calendar, determine progress.

The information website available now is separate from the later public evidence product.

Coverage and gaps

Solana is the first target. Stage 2 must name each supported network, program and decoder, source commitment, observation window and known gap. A market listing is not evidence of protocol coverage.

Token lifecycle, launch-role, liquidity, swap and bridge interpretation need their own validated decoders. Missing history remains unknown. Explore shows source timestamps, queued work, launch records and supported retained transfers. Its trace tool operates on incomplete retained evidence and does not establish account ownership or wrongdoing.

Nodes and operators

Outside operator participation belongs to Stage 5. There is no public node download, reward program or validator enrollment yet. Multiple services run by one owner do not count as independent operators.